This project involved preparing and finishing a kitchen wall in Bilton, Harrogate. After the removal of tiles, the wall surface was uneven and required bonding before plastering. We left the space smooth and ready for splashback installation and final decoration.
SCOPE OF WORK
Removal of remaining tile residue and prep of surface
Application of bonding coat to level out the wall
Taping and beading to strengthen edges and corners